You don't have javascript enabled. Good luck with that.
Pencarian
Kereta MRT Jakarta Gunakan Sistem Persinyalan Canggih

PT MRT Jakarta to Use CBTC Signaling System

PT MRT Jakarta President Director, William Sabandar revealed, in operating Mass Rapid Transit (MRT) Jakarta, his party is about to use the communication-based train control (CBTC) made in Japan.

CBTC is a railway-based communication control system with radio frequency (RF) as data communication between various integrated subsystems

The system has two main functions, namely to detect train and to protect train if it goes too fast.

"CBTC is a railway-based communication control system with radio frequency (RF) as data communication between various integrated subsystems," he stated, Thursday (5/31).

LRT Phase II Project will Use KPDBU Scheme

He explained, to detect a train using a radio device or wayside radio set (WRS) stationed on the train track and on the train set. The radio is connected to the operation control center (OCC). Thus the train will operate without machinist and controlled by OCC.

"That means we can know where the train location every second and won't go wrong. So the protection level is very high," he explained.

From security level, CBTC system will detect if the train goes too fast. Thus it can be anticipated early.

"By so signaling system is very sophisticated and safe," he stated.

Linked News
Popular News indeks
  1. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  2. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye768 personBudhi Firmansyah Surapati
  3. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye765 personAldi Geri Lumban Tobing
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye617 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye457 personFolmer